Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

The Second NEK Periodic Safety Review Program (CROSBI ID 561081)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Antolovič, Aleksandra ; Bašić, Ivica ; Vrbanić, Ivan The Second NEK Periodic Safety Review Program // Proceedings of the International Conference Nuclear Energy for New Europe 2009 / Cizelj, Leon ; Končar, Boštjan ; Leskovar, Matjaž (ur.). Ljubljana: Nuclear Society of Slovenia, 2009. str. 504.1-504.14

Podaci o odgovornosti

Antolovič, Aleksandra ; Bašić, Ivica ; Vrbanić, Ivan

engleski

The Second NEK Periodic Safety Review Program

Within the frame of the first NPP Krsko (NEK) Periodic Safety Review (PSR), a comprehensive and documented review has been performed of the plant operational and design status. Review confirmed that the plant was as safe as originally intended and didn’t found any structures, systems, components, human activities or administrative processes that could limit the life of the plant in the foreseeable future. This review had not revealed any major safety issue. As a result, it was found that Krsko NPP could safely operate, as a minimum up to the completion of the next Periodic Safety Review. The purpose of the present paper is to discuss a developed program for the second NPP Krsko Periodic Safety Review (PSR). The program considers three major inputs which represent a referential ground for the second Krsko PSR. They are: 1. The program, experience and results from the first NPP Krsko PSR, 2. The development of national legislation and requirements relevant for the PSR, which took place in the meantime, 3. Changes in the international perception of the PSR resulting in changes in the relevant international guiding documents reflecting on PSR. The paper discuss all relevant elements of the second Periodic Safety Review that need to be agreed and confirmed by the Regulator (SNSA). It discusses the definition of objectives and scope of the review, selection of methods and assessment criteria as well as managerial and procedural / quality assurance arrangements related to PSR. Program also provides a basic guidance to the PSR team regarding methodological approaches to be used in the assessment.

NEK; PSR

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

504.1-504.14.

2009.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of the International Conference Nuclear Energy for New Europe 2009

Cizelj, Leon ; Končar, Boštjan ; Leskovar, Matjaž

Ljubljana: Nuclear Society of Slovenia

978-961-6207-30-0

Podaci o skupu

International Conference Nuclear Energy for New Europe 2009

predavanje

14.09.2009-17.09.2009

Bled, Slovenija

Povezanost rada

Elektrotehnika