Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Construction of Krka River Arch Bridge near Skradin (CROSBI ID 558196)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Šavor, Zlatko ; Mujkanović, Nijaz ; Hrelja, Gordana ; Kindij, Alex ; Trlaja, Davor Construction of Krka River Arch Bridge near Skradin // CONSTRUCTION OF ARCH BRIDGES / Chen, Baochun ; Radić, Jure (ur.). Zagreb: SECON, 2009. str. 323-332

Podaci o odgovornosti

Šavor, Zlatko ; Mujkanović, Nijaz ; Hrelja, Gordana ; Kindij, Alex ; Trlaja, Davor

engleski

Construction of Krka River Arch Bridge near Skradin

A new concrete arch bridge with 204.0 m span was constructed across the Krka River canyon on the section Skradin-Šibenik of the Adriatic highway. The bridge site lies in an environmentally protected area very close to the Krka national park. The superstructure is continuous with spans L=3x32.0+3x28.0+3x32.0+28.0+24.0=360.0 m. The application of the composite superstructure, made possible significant reduction of the dead weight and enhanced the bridge appearance in comparison to other Croatian concrete arch bridges. The construction of the bridge across the Krka River canyon commenced in the year 2003 and was successfully completed in two years in the year 2005. The whole arch cross section was constructed by free cantilevering, on traveling formwork carriages, in segments 5.25 meters long, starting symmetrically from arch abutments. Double columns at the arch abutments had to be extended by auxiliary steel staying pylons to facilitate successive cantilevering. The arch was supported during construction by stays equilibrated by anchor stays, connected to rock anchors. The steel superstructure grillage was erected by longitudinal launching in three phases. The concrete deck plate constists of from full depth precast slabs interconnected by on site concreting of longitudinal and transversal joints above shear connectors. A detailed review of the Krka Bridge construction is elaborated upon in the paper.

Arch; Bridge; Bridge design; Free cantilevering; Auxiliary pylons

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

323-332.

2009.

objavljeno

Podaci o matičnoj publikaciji

CONSTRUCTION OF ARCH BRIDGES

Chen, Baochun ; Radić, Jure

Zagreb: SECON

978-953-7621-03-2

Podaci o skupu

2nd Chinese-Croatian Joint Colloquium on CONSTRUCTION OF ARCH BRIDGES

predavanje

05.10.2009-09.10.2009

Fuzhou, Kina

Povezanost rada

Građevinarstvo