Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Generation of Optimal Vessel’ s Production Costs Structure (CROSBI ID 154456)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Fafandjel, Nikša ; Zamarin, Albert ; Hadjina, Marko Generation of Optimal Vessel’ s Production Costs Structure // Strojarstvo : časopis za teoriju i praksu u strojarstvu, 50 (2008), 2; 77-84

Podaci o odgovornosti

Fafandjel, Nikša ; Zamarin, Albert ; Hadjina, Marko

engleski

Generation of Optimal Vessel’ s Production Costs Structure

Newbuilding production costs structure represents a major management activity. Therefore, vessel's market price has a tremendous influence at shipyard's determination of vessel price offered to buyers. For this reason shipyard management is forced to concentrate its effort to act upon newbuilding production costs structure optimisation as to achieve the goal of profitable shipyard enterprise. In this paper a computer integrated mathematical model of costing engineering of vessel production generated by authors is presented. Proposed cost structure configuration is based on both, functional and technological, vessel breakdown structures. Statistical analysis of data was performed for a sample of tankers population, built in Croatian shipyards. Probabilistic theory was applied and several results such as of expectation for aggregate figures are presented. Such developed tool for obtaining an optimal production costs structure enables shipyard management besides more successful managing and decision making, also latter, through the process a better costs control within model parameters. Dynamic control is needed of costing figures within optimised structure of production costs that for assigned conditions, for the whole shipbuilding process and product, have significant influence upon performance final results. Mathematical model for achieving optimal structure of production costs was verified and tested against real sample of tanker newbuildings, not included previously in cost structure generation.

production costs analysis; ship building industry; stochastic processes

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

50 (2)

2008.

77-84

objavljeno

0562-1887

Povezanost rada

Brodogradnja

Indeksiranost