Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Foundation improvement for a building on loess soil (CROSBI ID 551932)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Mulabdić, Mensur ; Minažek, Krunoslav Foundation improvement for a building on loess soil // Proceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering / Hamza, Mamdouh ; Shahien, Marawan ; El-Mossallamy, Yasser (ur.). Alexandria: IOS Press, 2009. str. 2362-2365 doi: 10.3233/978-1-60750-031-5-2362

Podaci o odgovornosti

Mulabdić, Mensur ; Minažek, Krunoslav

engleski

Foundation improvement for a building on loess soil

A high school two store building made of bricks, about 200 years old, suffered from settlement caused by increase of water content in loess soil, as a result of leakage of sewage system. Soil improvement with use of jet-grouting was designed and applied as a measure of foundation improvement and suppression of further settlement and fissuring of the building. Grouting was executed on outer and inner foundations, in the region affected by settlement, to the depth of 12 m under surface. In order to assure most suitable grouting technique a trial piles of jet-grouting were executed, aside from the object, using different pressures, direction of jet and time of jet action in place. With the pressure of 400 bar columns of 55 cm in diameter were obtained and it was accepted as a good result having in mind distance and spacing of boreholes under foundation. During execution of soil improvement measurement of soil deformation with depth and measurement of cracks in walls was performed, as well as topographic measurement of points on building. Before start of jet – grouting tunnels under building were filled with special concrete through the borehole from the surface. Comprehensive measurement of soil deformations, settlement and cracks on the building was performed before, during and after remediation work. Movements of the building ceased some time after the work was done, indicating that remediation work was successful.

settlement ; soil ; improvement ; jet-grouting ; monitoring

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

2362-2365.

2009.

objavljeno

10.3233/978-1-60750-031-5-2362

Podaci o matičnoj publikaciji

Proceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering

Hamza, Mamdouh ; Shahien, Marawan ; El-Mossallamy, Yasser

Alexandria: IOS Press

7891-352X

Podaci o skupu

17th International Conference on Soil Mechanics and Geotechnical Engineering

ostalo

05.10.2009-09.10.2009

Aleksandrija, Egipat

Povezanost rada

Građevinarstvo

Poveznice
Indeksiranost