Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

DESIGN AND CONSTRUCTION OF KRKA RIVER ARCH BRIDGE (CROSBI ID 546367)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Šavor, Zlatko ; Mujkanović, Nijaz ; Hrelja, Gordana DESIGN AND CONSTRUCTION OF KRKA RIVER ARCH BRIDGE // LONG ARCH BRIDGES / Radić, Jure ; Chen, Baochen (ur.). Zagreb: SECON HDGK, 2008. str. 217-228

Podaci o odgovornosti

Šavor, Zlatko ; Mujkanović, Nijaz ; Hrelja, Gordana

engleski

DESIGN AND CONSTRUCTION OF KRKA RIVER ARCH BRIDGE

A new concrete arch bridge with 204.0 m span was constructed across the Krka River canyon on the section Skradin-Šibenik of the Adriatic highway. The bridge site lies in an environmentally protected area very close to the Krka national park. The superstructure is continuous with spans L=3x32.0+3x28.0+3x32.0+28.0+24.0=360.0 m comprising two main steel box-type beams spaced at 7.6 m, strong steel cross beams and a concrete deck plate in composite action with both main and cross beams. The application of the composite superstructure, made possible significant reduction of the dead weight and enhanced the bridge appearance in comparison to other Croatian concrete arch bridges. Because of the importance of the Krka River bridge and aggressive environment monitoring system was installed for measurements of deformations, local temperature values, movements in service at critical points and corrosion rate. The construction of the bridge across the Krka River canyon commenced in the year 2003 and was successfully completed in two years in 2005. The whole arch cross section was constructed by free cantilevering, on traveling formwork carriages, in segments 5.25 meters long, starting symmetrically from arch abutments. Piers at the arch abutments had to be extended by auxiliary steel staying pylons to facilitate successive cantilevering. The arch was supported during construction by stays equilibrated by anchor stays, connected to rock anchors. The steel superstructure grillage was erected by longitudinal launching in three phases. The concrete deck plate consists of from full depth precast slabs interconnected by on site concreting of longitudinal and transversal joints above shear connectors.

Arch; bridge; bridge design; composite superstructure

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

217-228.

2008.

objavljeno

Podaci o matičnoj publikaciji

LONG ARCH BRIDGES

Radić, Jure ; Chen, Baochen

Zagreb: SECON HDGK

978-953-7621-00-1

Podaci o skupu

Chinese-Croatian Joint Colloquium on LONG ARCH BRIDGES

predavanje

10.07.2008-14.07.2008

Brijuni, Hrvatska

Povezanost rada

Građevinarstvo