Prioritization procedure for the power transmission lines and transformers revitalization (CROSBI ID 148581)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Bajs, Davor ; Majstrović, Goran ; Medić, Ivan Prioritization procedure for the power transmission lines and transformers revitalization // International review of civil engineering, 3 (2008), 5; 768-778

Podaci o odgovornosti

Bajs, Davor ; Majstrović, Goran ; Medić, Ivan

engleski

Prioritization procedure for the power transmission lines and transformers revitalization

Important issue for the Transmission System Operators is how to deal with older transmission assets. To ensure system reliability and security over a long time frame, Transmission System Operators should develop appropriate methodology and procedure for the power transmission assets revitalization or replacement. This paper describes one approach to prioritize transmission lines and transformers for revitalization according to the predefined criteria based on an asset condition and its importance within a power system. Example of the prioritization procedure is given in the paper.

System reliability and security; Transmission assets; Revitalization; Prioritization

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

3 (5)

2008.

768-778

objavljeno

2036-9913

Povezanost rada

Elektrotehnika

Indeksiranost