Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Site establishment dynamics during construction of Eurodom in Osijek (CROSBI ID 543239)

Prilog sa skupa u zborniku | sažetak izlaganja sa skupa | međunarodna recenzija

Dolaček-Alduk, Zlata ; Čorić, Josip ; Dadić, Tamara ; Brleković, Dražen Site establishment dynamics during construction of Eurodom in Osijek // Organization, technology and management in construction / Radujković, Mladen ; Mlinarić, Vjeran ; Izetbegović, Jadranko et al. (ur.). Umag: Hrvatska Udruga za Organizaciju Građenja, 2008. str. 16-16

Podaci o odgovornosti

Dolaček-Alduk, Zlata ; Čorić, Josip ; Dadić, Tamara ; Brleković, Dražen

engleski

Site establishment dynamics during construction of Eurodom in Osijek

The construction site of the Eurodom causes great attention of construction profession because of the fact that it is the biggest construction site in the city and its surroundings. The construction of Eurodom reached some of the significant construction achievements like the deepest sheet-pile wall with free end, the biggest ground anchors in sandy-clayey soil, one of the deepest excavation pits in Croatia, as well as the construction of drainage system with the aim of preventing water buoyancy on the foundation slab with its own pumping station. Because of the fact that the construction site is situated in an urban city environment with very high traffic intensity, there was a need of extensive and detailed preliminary works on construction site organization, along with ensuring access to the site and conducting demanding construction works under the condition that contact public and traffic areas stay untouched. This paper presents the dynamics of these works in terms of changes in site establishment that were happening in line with the type and proportion of works on the site from the preliminary works, during excavations, till today, when the construction project of the future complex is in progress.

site establishment; preliminary works; construction site organization; construction management

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

16-16.

2008.

objavljeno

Podaci o matičnoj publikaciji

Organization, technology and management in construction

Radujković, Mladen ; Mlinarić, Vjeran ; Izetbegović, Jadranko ; Cerić, Anita

Umag: Hrvatska Udruga za Organizaciju Građenja

953-96245-8-4

Podaci o skupu

8th International Conference (5th SENET Conference) Organization, technology and management in construction

predavanje

17.09.2008-20.09.2008

Umag, Hrvatska

Povezanost rada

Povezane osobe




nije evidentirano