Case study: LCC analysis for Krk Bridge (CROSBI ID 539604)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Stipanović Oslaković, Irina ; Bjegović, Dubravka ; Radić, Jure
engleski
Case study: LCC analysis for Krk Bridge
The Krk Bridge (constructed between 1976– 1980) connects the mainland and the island of Krk, and consists of two arches including one of the largest conventionally reinforced concrete arch span in the world. During more than 25 years of service the bridge was exposed to very aggressive environment which caused corrosion problems. Therefore, structures of both arches are being repaired intensively during last 10 years. In this paper approximate costs of the maintenance and repair works performed during last 3 decades on the small and big arch of the Krk bridge are analysed. The actual costs are compared to the estimated costs of the life cycle management, if outer layer of carbon steel reinforcement had been replaced with stainless steel.
LCC analysis; service life; corrosion; maintenance; repair works
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
214-214.
2008.
objavljeno
Podaci o matičnoj publikaciji
Tailor made concrete structures. New solutions for our society
Walraven, Joost C. ; Stoelhorst, Dick
London : Delhi: Taylor & Francis
978-0-415-47535-8
Podaci o skupu
Tailor made concrete structures. New solutions for our society
predavanje
19.05.2008-22.05.2008
Amsterdam, Nizozemska