Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Design and construction of Cetina River arch bridge (CROSBI ID 532015)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Žderić, Željko ; Runjić, A. ; Hrelja, Gordana Design and construction of Cetina River arch bridge // Proceedings of the 5th International Conference on Arch Bridges / Lourenco, Paulo B. ; Oliveira, Daniel V. ; Portela, Artur (ur.). Multicomp, Lda., 2007. str. 745-750-x

Podaci o odgovornosti

Žderić, Željko ; Runjić, A. ; Hrelja, Gordana

engleski

Design and construction of Cetina River arch bridge

A new concrete arch bridge with 140.30 m span was constructed across the Cetina River canyon near the town of Trilj. The beautiful river canyon is an environmentally protected area, and arch structure was selected as it harmoniously blends into the landscape. The arch is of span 140 m with rise of 21.5 m, givinig rise-to-span ratio of 1/6.5. The construction of the bridge across Cetina River canyon commenced in the year 2005 and it will be opened for traffic in June 2007.

arch bridge; River Cetina canyon; environmentally protected area

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

745-750-x.

2007.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of the 5th International Conference on Arch Bridges

Lourenco, Paulo B. ; Oliveira, Daniel V. ; Portela, Artur

Multicomp, Lda.

978-972-8692-31-5

Podaci o skupu

5th International Conference on Arch Bridges

predavanje

12.09.2007-14.09.2007

Madeira, Portugal

Povezanost rada

Građevinarstvo