Dynamic Planning of Medium Voltage Open- Loop Distribution Networks under Uncertainty (CROSBI ID 518136)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Skok, Minea ; Krajcar, Slavko ; Škrlec, Davor Dynamic Planning of Medium Voltage Open- Loop Distribution Networks under Uncertainty // Proceedings of 13th Conference on Intelligent Systems Application to Power Systems (ISAP 2005),. 2005. str. 551-556-x

Podaci o odgovornosti

Skok, Minea ; Krajcar, Slavko ; Škrlec, Davor

engleski

Dynamic Planning of Medium Voltage Open- Loop Distribution Networks under Uncertainty

An efficient method to address the multi-stage planning of open loop structured mv distribution networks under uncertainty, taking into account distributed generation connected to distribution system, has been proposed. The fuzzy model can cope with important features implicit in planning studies such as time-phased representation, consideration of conflicting objectives and uncertainty in loads, distributed generation and economic data. Using two evolutionary algorithms simultaneous optimization of costs and the reliability is achieved. Thus, in addition to optimal radial layout along several stages in time, the algorithm can determine the optimal locations of reserve feeders that achieve the best network reliability with the lowest expansion and operational costs. The model and evolutionary algorithms have been applied intensively to real life power distribution systems showing its potential applicability to significantly larger systems than those frequently found in literature about dynamic distribution networks planning. Results have illustrated the significant influence of the uncertainties in the optimal distribution network planning mainly in terms of topology and supply capacity of the resulting optimal distribution system.An efficient method to address the multi-stage planning of open loop structured mv distribution networks under uncertainty, taking into account distributed generation connected to distribution system, has been proposed. The fuzzy model can cope with important features implicit in planning studies such as time-phased representation, consideration of conflicting objectives and uncertainty in loads, distributed generation and economic data. Using two evolutionary algorithms simultaneous optimization of costs and the reliability is achieved. Thus, in addition to optimal radial layout along several stages in time, the algorithm can determine the optimal locations of reserve feeders that achieve the best network reliability with the lowest expansion and operational costs. The model and evolutionary algorithms have been applied intensively to real life power distribution systems showing its potential applicability to significantly larger systems than those frequently found in literature about dynamic distribution networks planning. Results have illustrated the significant influence of the uncertainties in the optimal distribution network planning mainly in terms of topology and supply capacity of the resulting optimal distribution system.

primary distribution network; planning; open-loop network; evolutionary algorithm; dynamic model; uncertainty; robustness; fuzzy sets

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

551-556-x.

2005.

objavljeno

Podaci o matičnoj publikaciji

Podaci o skupu

13th Conference on Intelligent Systems Application to Power Systems (ISAP 2005)

predavanje

06.11.2005-10.11.2005

Sjedinjene Američke Države

Povezanost rada