Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

A Knowledge - Based System for Power System Weekly Scheduling (CROSBI ID 122412)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Fuštar, Stipe ; Jelavić, Branka A Knowledge - Based System for Power System Weekly Scheduling // International journal of electrical power & energy systems, 13 (1992), 2/3; 206-211. doi: 10.1016/0142-0615(92)90046-C

Podaci o odgovornosti

Fuštar, Stipe ; Jelavić, Branka

engleski

A Knowledge - Based System for Power System Weekly Scheduling

A new knowledge based system for weekly power system operation scheduling is introduced. The proposed weekly scheduler includes load prediction, inflow prediction, possible run-of-river hydro production, storage hydro production, unit-commitment, generator maintenance and power interchange. Croatian electric power system is utilized to test the proposed knowledge based system.

knowledge-based system; knowledge base; operation planning

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

13 (2/3)

1992.

206-211

objavljeno

0142-0615

10.1016/0142-0615(92)90046-C

Povezanost rada

Elektrotehnika

Poveznice
Indeksiranost