Geotechnical Design of the St.Mark Tunnel (CROSBI ID 515226)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Stojković, Branko ; Stanić, Bogdan ; Kovačević, Meho-Saša
engleski
Geotechnical Design of the St.Mark Tunnel
The application of the integrated design method for the St. Mark tunnel in Croatia is presented. The integrated method combines the empirical, rational and observational approaches in designing the tunnel. The design can, thus, proceed in two phases, prior to and during the tunnel construct ion. The geotechnical structure was under full control at all construction stages, and the tunnel completion was possible 2.5 months ahead of schedule. The paper describes the project solutions, programme and the procedure of the second phase of design, the construction technology, the results of geotechnical monitoring and the backanalysis, and intervention during construction.
tunnel; design; monitoring; support system
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
47-57-x.
2002.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the AITES-ITA Downunder 2002
Sydney: ITA
Podaci o skupu
Modern Tunnels - Challenges and Solutions. 28^th ITA General Assembly and World Tunnel Congress
predavanje
02.03.2002-08.03.2002
Sydney, Australija