Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Geotechnical Design of the St.Mark Tunnel (CROSBI ID 515226)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Stojković, Branko ; Stanić, Bogdan ; Kovačević, Meho-Saša Geotechnical Design of the St.Mark Tunnel // Proceedings of the AITES-ITA Downunder 2002. Sydney: ITA, 2002. str. 47-57-x

Podaci o odgovornosti

Stojković, Branko ; Stanić, Bogdan ; Kovačević, Meho-Saša

engleski

Geotechnical Design of the St.Mark Tunnel

The application of the integrated design method for the St. Mark tunnel in Croatia is presented. The integrated method combines the empirical, rational and observational approaches in designing the tunnel. The design can, thus, proceed in two phases, prior to and during the tunnel construct ion. The geotechnical structure was under full control at all construction stages, and the tunnel completion was possible 2.5 months ahead of schedule. The paper describes the project solutions, programme and the procedure of the second phase of design, the construction technology, the results of geotechnical monitoring and the backanalysis, and intervention during construction.

tunnel; design; monitoring; support system

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

47-57-x.

2002.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of the AITES-ITA Downunder 2002

Sydney: ITA

Podaci o skupu

Modern Tunnels - Challenges and Solutions. 28^th ITA General Assembly and World Tunnel Congress

predavanje

02.03.2002-08.03.2002

Sydney, Australija

Povezanost rada

Građevinarstvo