Construction of Sava river quay in Croatia (CROSBI ID 508385)
Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija
Podaci o odgovornosti
Sorić, Zorislav ; Kišiček, Tomislav ; Galić, Josip
engleski
Construction of Sava river quay in Croatia
After eighteen months of construction work, the 120 meter reinforced concrete quay on river Sava at Slavonski Brod, Croatia, has been finished. Foundation of the structure, was made of geotechnical diaphragms and piles. Quay structure consist of in-situ constructed base girders, longitudinal and transverse walls, as well as of columns. Reinforced concrete elements at upper level such as girders and plates were prefabricated, while upper slab were cast in place.
reinforced concrete quay; base girders; concrete walls; columns; prefabricated girders and plates
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
305-312-x.
2005.
objavljeno
Podaci o matičnoj publikaciji
Proceednigs of the International conference on Concrete for Structure, INCOS 05
Sergio, Lopes
Coimbra: Universidade de Coimbra
Podaci o skupu
INCOS 05 - The International conference on Concrete for Structure
predavanje
07.07.2005-08.07.2005
Coimbra, Portugal