Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Construction of Sava river quay in Croatia (CROSBI ID 508385)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Sorić, Zorislav ; Kišiček, Tomislav ; Galić, Josip Construction of Sava river quay in Croatia // Proceednigs of the International conference on Concrete for Structure, INCOS 05 / Sergio, Lopes (ur.). Coimbra: Universidade de Coimbra, 2005. str. 305-312-x

Podaci o odgovornosti

Sorić, Zorislav ; Kišiček, Tomislav ; Galić, Josip

engleski

Construction of Sava river quay in Croatia

After eighteen months of construction work, the 120 meter reinforced concrete quay on river Sava at Slavonski Brod, Croatia, has been finished. Foundation of the structure, was made of geotechnical diaphragms and piles. Quay structure consist of in-situ constructed base girders, longitudinal and transverse walls, as well as of columns. Reinforced concrete elements at upper level such as girders and plates were prefabricated, while upper slab were cast in place.

reinforced concrete quay; base girders; concrete walls; columns; prefabricated girders and plates

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

305-312-x.

2005.

objavljeno

Podaci o matičnoj publikaciji

Proceednigs of the International conference on Concrete for Structure, INCOS 05

Sergio, Lopes

Coimbra: Universidade de Coimbra

Podaci o skupu

INCOS 05 - The International conference on Concrete for Structure

predavanje

07.07.2005-08.07.2005

Coimbra, Portugal

Povezanost rada

Građevinarstvo