The Correlation between the Realization of time Quota and the Spoilage Percentage in Mechanical Manufacture (CROSBI ID 467940)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Figurić, Mladen ; Greger, Krešimir
engleski
The Correlation between the Realization of time Quota and the Spoilage Percentage in Mechanical Manufacture
The problem of high production quota exceedings accompanied by a high percentage of spoilage is a phenomenon occurring in almost every enterprise. It is a consequence of linking the personal earnings to the number of manufactured parts, irrespective of their quality. The research on the correlation between the percentage of the production quota exceeding and the percentage of spoilage helps to test the justifiability of linking the earnings to the production quota fulfillment. The article offers a proposition for setting up of a stimulative pay system which would combine the quantity and quality factors. Two prerequisites should be satisfied before such a stimulative system can be put into effect: the introduction of the time study & analysis and quality control.
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
132-136.
1998.
objavljeno
Podaci o matičnoj publikaciji
Zborník z medzinárodnej vedeckej konferencie Kvalita v čalunnictve
Rašner, J.
Zvolen: Tehničko Sveučilište u Zvolenu (TUZ)
Podaci o skupu
Kvalita v čalunnictve
predavanje
01.01.1998-01.01.1998
Zvolen, Slovačka