Estimation of Expenses for Low and Intermediate Level Radioactive Waste Repository Project in Croatia up to Site License Acquisition (CROSBI ID 502741)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Schaller, Antun ; Lokner, Vladimir ; Subašić, Damir Estimation of Expenses for Low and Intermediate Level Radioactive Waste Repository Project in Croatia up to Site License Acquisition // Proceedings of International Conference 'Nuclear Energy for New Europe 2003' / Stritar, Andrej (ur.). Ljubljana: Društvo jedrskih strokovnjakov Slovenije, 2003

Podaci o odgovornosti

Schaller, Antun ; Lokner, Vladimir ; Subašić, Damir

engleski

Estimation of Expenses for Low and Intermediate Level Radioactive Waste Repository Project in Croatia up to Site License Acquisition

The expenses needed for development of low- and intermediate level radioactive waste (LILW) repository project in Croatia include: (a) preliminary activities, (b) preparatory activities, and (c) preparing of environmental impact study. The first group of expenses are referring to the project leading activities, project plan updating, build-up of required infrastructure, preparing of licensing documentation, site investigations, data acquisition programme, pre-operational radio-ecological monitoring, modelling, safety analysis (first iteration) and public related activities. Preparatory activities are referring to purchasing of land for repository and preparatory activities for carrying out of on-site investigations, while third group of expenses are related to preparation and validation of Environmental impact study. It was found out that about 50 % of total expenses refer to build-up of infrastructure. Additional 25 % finances are related to radio-ecological monitoring, site investigations and development of calculations and models, while remaining 25 % of total estimated sum is expected to be spent for repository safety assessment, public relations, purchasing and preparing the on-site terrain for construction, etc. It was calculated 607 EUR per m3 of LILW to be needed up to site license acquisition. According to the world-wide practice, by extrapolating of additional expenses necessary for construction of the repository and acquisition of operational license, it comes out the cost of 1, 723 EUR per m3 of LILW for shallow-ground and 2, 412 EUR per m3 of LILW for tunnel repository. The estimated expenses for Croatia are within the span of expenses for the same purpose in the countries considered. Expected duration of the project performance up to acquisition of the site license is 4 years and 3 months.

Radioactive waste; repository; licensing acitivities expenses plan

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

2003.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of International Conference 'Nuclear Energy for New Europe 2003'

Stritar, Andrej

Ljubljana: Društvo jedrskih strokovnjakov Slovenije

Podaci o skupu

International Conference 'Nuclear Energy for New Europe 2003'

predavanje

08.09.2003-11.09.2003

Portorož, Slovenija

Povezanost rada

Geologija