RECONSTRUCTION OF THE PAG BRIDGE (CROSBI ID 494429)

Prilog sa skupa u zborniku | sažetak izlaganja sa skupa | međunarodna recenzija

Šavor, Zlatko ; Mujkanović, Nijaz ; Puž, Goran RECONSTRUCTION OF THE PAG BRIDGE // STRUCTURAL FAULTS & REPAIR-2003 / Forde, Michael C. (ur.). London : Delhi: Comonwealth Institute, 2003. str. 162-165-x

Podaci o odgovornosti

Šavor, Zlatko ; Mujkanović, Nijaz ; Puž, Goran

engleski

RECONSTRUCTION OF THE PAG BRIDGE

The Pag bridge was thoroughly reconstructed because of heavy damages caused by reinforcement corrosion. The design of new steel superstructure is presented. The repair of piers is briefly described. Effects of the superstructure replacement on the arch behaviour are discussed. The numerical analysis showed high sensitivity of the relatively elastic arch to the change of dead weight distribution.

concrete bridges; reinforced concrete arch; bridge repair; reinforcement corrosion

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

162-165-x.

2003.

objavljeno

Podaci o matičnoj publikaciji

STRUCTURAL FAULTS & REPAIR-2003

Forde, Michael C.

London : Delhi: Comonwealth Institute

Podaci o skupu

STRUCTURAL FAULTS + REPAIR - 2003

predavanje

01.07.2003-03.07.2003

London, Ujedinjeno Kraljevstvo

Povezanost rada