RECONSTRUCTION OF THE PAG BRIDGE
The Pag bridge was thoroughly reconstructed because of heavy damages caused by reinforcement corrosion. The design of new steel superstructure is presented. The repair of piers is briefly described. Effects of the superstructure replacement on the arch behaviour are discussed. The numerical analysis showed high sensitivity of the relatively elastic arch to the change of dead weight distribution.
concrete bridges; reinforced concrete arch; bridge repair; reinforcement corrosion
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
162-165-x.
2003.
objavljeno
Podaci o matičnoj publikaciji
STRUCTURAL FAULTS & REPAIR-2003
Forde, Michael C.
London : Delhi: Comonwealth Institute
Podaci o skupu
STRUCTURAL FAULTS + REPAIR - 2003
predavanje
01.07.2003-03.07.2003
London, Ujedinjeno Kraljevstvo