Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem (CROSBI ID 493899)

Prilog sa skupa u zborniku | sažetak izlaganja sa skupa | međunarodna recenzija

Šorić, Kristina ; Vojvodić Rosenzweig, Višnja ; Lukač, Zrinka Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem // 5th EURO/INFORMS Joint International Meeting / Gulay Barbarosoglu (ur.). Istanbul, 2003. str. 189-x

Podaci o odgovornosti

Šorić, Kristina ; Vojvodić Rosenzweig, Višnja ; Lukač, Zrinka

engleski

Lot Sizing Problem with Equipment Replacement as a Bilevel Programming Problem

The object of a Production Lot Sizing Problem is to minimize the sum of the costs of production, storage and set up. On the other hand, an Equipment Replacement Problem concerns a machine which deteriorates with age and the decision to replace it. The object is to decide when to replace the machine in order to maximize the utility of operating it. We introduce the hierarchy into the problem, and model the problem as the new bilevel mixed 0-1 integer programming problem called Bilevel Lot Sizing Problem with Equipment Replacement. We develop heuristics based on tabu search for solving the problem.

Lot sizing problem; equipment replacement; bilevel programming; heuristics

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

189-x.

2003.

objavljeno

Podaci o matičnoj publikaciji

5th EURO/INFORMS Joint International Meeting

Gulay Barbarosoglu

Istanbul:

Podaci o skupu

5th EURO/INFORMS Joint International Meeting

predavanje

06.07.2003-10.07.2003

Istanbul, Turska

Povezanost rada

Matematika