Status report of the n_TOF facility after the 2nd CERN long shutdown period (CROSBI ID 325759)
Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Patronis, N. ; ... ; Bosnar, Damir ; ... ; Žugec, Petar
n_TOF Collaboration
engleski
Status report of the n_TOF facility after the 2nd CERN long shutdown period
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
neutron time of flight, spallation target, nuclear astrophysics ; Neutron physics, neutron induced fission, neutron reactions
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o izdanju
10
2023.
10
13
objavljeno
2195-7045
2195-7045
10.1140/epjti/s40485-023-00100-w
Povezanost rada
Fizika