NORMENG - Automated Resource Standardization System for Energy-Efficient Construction - Project Progress Report (CROSBI ID 725827)

Prilog sa skupa u zborniku | ostalo | međunarodna recenzija

Završki, Ivica ; Cerić, Anita ; Vukomanović, Mladen ; Sigmund, Zvonko ; Lovrenčić Butković, Lana ; Mihić, Matej ; Kolarić, Sonja ; Ivić, Ivona NORMENG - Automated Resource Standardization System for Energy-Efficient Construction - Project Progress Report // 15th International OTMC Conference and 6th IPMA Senet Conference: Smart Built Environment through Digital Transformation. Zagreb, 2022. str. 509-516

Podaci o odgovornosti

Završki, Ivica ; Cerić, Anita ; Vukomanović, Mladen ; Sigmund, Zvonko ; Lovrenčić Butković, Lana ; Mihić, Matej ; Kolarić, Sonja ; Ivić, Ivona

engleski

NORMENG - Automated Resource Standardization System for Energy-Efficient Construction - Project Progress Report

This paper presents progressive results of the project named Development of automated resource standardization system for energy- efficient construction (NORMENG) that have been achieved till the half of the three years duration of the project. The research has been directed in two streams. The first one is a study of classification systems for the construction industry (e.g., Uniclass 2015, OmniClass, CoClass, etc.) that enable data structuring in an agreed way and can be used for structuring cost information, specifications, and project information in general. The importance of classification is growing because building projects get more complex and international, but also because project data are based on automated processes. The second stream of research is dealing with construction work progress monitoring with use of two different digitalization tools: Faro Focus LIDAR scanner and drones. To find out the limitations of the rather innovative process of progress monitoring, six different work types were monitored, ranging from masonry works to fine plastering and painting works. The experimentation of the progress monitoring was conducted on a small house specially designed to implement all these six work types and to test out the possibilities and limitations of the progress monitoring technology in these specific conditions. In this paper, the authors will present the initial conclusions of the progress monitoring.

NORMENG ; resource standardization ; energy-efficient construction ; project progress

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

509-516.

2022.

objavljeno

Podaci o matičnoj publikaciji

15th International OTMC Conference and 6th IPMA Senet Conference: Smart Built Environment through Digital Transformation

Zagreb:

Podaci o skupu

15th International Conference Organization, Technology; 6th International Project Management Association Senet Conference

predavanje

21.09.2022-24.09.2022

Cavtat, Hrvatska

Povezanost rada

Građevinarstvo