Numerical modeling of a prefabrication and fabrication production line in a shipyard (CROSBI ID 723823)
Prilog sa skupa u zborniku | prošireni sažetak izlaganja sa skupa | domaća recenzija
Podaci o odgovornosti
Ložar, Viktor ; Opetuk, Tihomir ; Hadžić, Neven ; Cajner, Hrvoje
engleski
Numerical modeling of a prefabrication and fabrication production line in a shipyard
In this paper a brief overview of existing numerical models of the shipbuilding industry will be reviewed and the case of a prefabrication and fabrication production line (PFPL) will be presented. Therefore, the software tool Enterprise Dynamics will be employed to simulate the required production time for two virtual sections.
Enterprise Dynamics ; Numerical modeling ; Production lines ; Shipbuilding industry
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
97-98.
2022.
objavljeno
Podaci o matičnoj publikaciji
SORTA 2022 PROCEEDINGS
Degiuli, Nastia
Zagreb:
978-953-7738-86-0
Podaci o skupu
25th Symposium on Theory and Practice of Shipbuilding, In Memoriam prof. Leopold Sorta (SORTA 2022)
predavanje
07.09.2022-10.09.2022
Malinska, Hrvatska