Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Two-Step Manufacturing Process Measurement Model Using Qualitative and Quantitative Data—A Case of Newbuilding Dry-Docking (CROSBI ID 301823)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Rabar, Denis ; Rabar, Danijela ; Pavletić, Duško Two-Step Manufacturing Process Measurement Model Using Qualitative and Quantitative Data—A Case of Newbuilding Dry-Docking // Journal of marine science and engineering, 9 (2021), 5; 464-480. doi: 10.3390/jmse9050464

Podaci o odgovornosti

Rabar, Denis ; Rabar, Danijela ; Pavletić, Duško

engleski

Two-Step Manufacturing Process Measurement Model Using Qualitative and Quantitative Data—A Case of Newbuilding Dry-Docking

Newbuilding dry-docking is a part of the shipbuilding manufacturing process, common for vessels built on slipways. The subject of this research is steel-built vessels intended for non- restricted sea-going navigation. Based on former experience, the necessity of the dry-docking projects measurement has been noted as a managerial tool for performance estima-tion and project comparison. The dry-docking project is a complex task which includes the first self- propelled sea passage and the transfer of the manufacturing process to a remote place. The dry- docking result is a surveyed and coated vessel ready for sea trials and five-year service until the next dry-docking. This paper deals with a model which enables process measurement using the analytic hierarchy process (AHP) method for qualitative data related to the dry-docking places and data envelopment analysis (DEA) for quantitative data related to the vessels’ technical and cost data. The modelled data are collected from the completed dry-dockings, and the twen-ty-nine studied vessels represent the decision-making units (DMU) used in two-step process measurement calculations. The obtained results can distinguish the efficient DMUs, which create an efficient frontier as benchmarks or “the best practice units” in the given DMU set. For the non-efficient DMUs, the efficiency score and rate of improvements needed to reach the efficient frontier will be calculated, and the sources of inefficiency will be recognized.

shipbuilding ; process measurement ; multi-criteria decision making ; data envelopment analysis ; analytic hierarchy process

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

9 (5)

2021.

464-480

objavljeno

2077-1312

10.3390/jmse9050464

Povezanost rada

Brodogradnja, Ekonomija, Matematika

Poveznice
Indeksiranost