Idejni projekt zaštite od podlokavanja mosta Šamac (CROSBI ID 444231)
Ocjenski rad | diplomski rad
Podaci o odgovornosti
Ivić, Ivan
Kuspilić, Neven ; Gilja, Gordon
hrvatski
Idejni projekt zaštite od podlokavanja mosta Šamac
The aim of this paper is to make a preliminary design of protection against scour of the Šamac bridge based on the established existing condition. The aim of the work is to protect the riverbeds and shores from scour and further erosion in the area surrounding the bridge. The bases used for the design are geodetic, hydrological and geo-mechanical, which were also used to obtain input parameters for the calculation of the existing condition of the riverbed. The selected solution for the protection of shores from erosion is the construction of riverbank fortifications on the left and right banks and the construction of a stone embankment or rip-rap for the protection of the riverbed. Calculations of the functionality of the 2D model were performed for the selected solutions in the HEC-RAS program, along with calculation of the structure of the selected solution on several characteristic hydrological events and calculation of the stability of the structure.
zaštita od podlokavanja, rijeka Sava, most Šamac
nije evidentirano
engleski
Preliminary design of scour countermeasures for Šamac bridge
nije evidentirano
scour countermeasures ; Sava River ; Šamac bridge
nije evidentirano
Podaci o izdanju
47
23.09.2021.
obranjeno
Podaci o ustanovi koja je dodijelila akademski stupanj
Građevinski fakultet, Zagreb
Zagreb