Resilient Scheduling as a Response to Uncertainty in Construction Projects (CROSBI ID 297999)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Milat, Martina ; Knezić, Snježana ; Sedlar, Jelena Resilient Scheduling as a Response to Uncertainty in Construction Projects // Applied sciences (Basel), 11 (2021), 14; 6493, 19. doi: 10.3390/app11146493

Podaci o odgovornosti

Milat, Martina ; Knezić, Snježana ; Sedlar, Jelena

engleski

Resilient Scheduling as a Response to Uncertainty in Construction Projects

Complex construction projects are developed in a dynamic environment, where uncertainty conditions have a great potential to affect project deliverables. In an attempt to efficiently deal with the negative impacts of uncertainty, resilient baseline schedules are produced to improve the probability of reaching project goals, such as respecting the due date and reaching the expected profit. Prior to introducing the resilient scheduling procedure, a taxonomy model was built to account for uncertainty sources in construction projects. Thence, a multi-objective optimization model is presented to manage the impact of uncertainty. This approach can be described as a complex trade-off analysis between three important features of a construction project: duration, stability, and profit. The result of the suggested procedure is presented in a form of a resilient baseline schedule, so the ability of a schedule to absorb uncertain perturbations is improved. The proposed optimization problem is illustrated on the example project network, along which the probabilistic simulation method was used to validate the results of the scheduling process in uncertain conditions. The proposed resilient scheduling approach leads to more accurate forecasting, so the project planning calculations are accepted with increased confidence levels.

resilience ; baseline schedule ; uncertainty ; taxonomy ; construction project

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

11 (14)

2021.

6493

19

objavljeno

2076-3417

10.3390/app11146493