A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks (CROSBI ID 295474)
Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Kovačević, Meho Saša ; Bačić, Mario ; Vukomanović, Mladen ; Cerić, Anita
engleski
A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks
This paper proposes the framework for automatic calculation of secondary lining cracks remediation costs. A study focuses on the structural cracks resulting from the tunnel secondary lining overloading due to rock mass creep. It is based on the multi-phase workflow combining the on-site measurements of behavior of the rock mass surrounding the tunnel and advanced numerical modelling tools assisted by the custom custom-made neural network, as well as the cost calculations. The workflow is established through the developed TunnCrack LCC platform where the data communication protocols between phases provided the straightforward and automatic data flow. Based on the evaluated long-term behavior of a tunnel, the secondary lining crack repair cost could be calculated for the different crack widths. The established platform presents a step forward in proactive estimation of the secondary lining remediation costs, where the monitoring data is continuously used to enhance the estimates of the crack repair costs, providing the tunnel managers with information on lining remediation life cycle costs, thus easing the overall decision-making process.
LCC framework ; Tunnel lining ; Cracks ; Maintenance ; Tunnel monitoring ; Neural networks
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o izdanju
129
2021.
103714
9
objavljeno
0926-5805
1872-7891
10.1016/j.autcon.2021.103714