Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

The ESSnuSB project (CROSBI ID 702354)

Prilog sa skupa u zborniku | kratko priopćenje | međunarodna recenzija

(ESSnuSB) Kliček, Budimir The ESSnuSB project // Proceedings of Science Volume 390 - 40th International Conference on High Energy physics (ICHEP2020) - Parallel: Neutrino Physics. Sissa Medialab, 2021. doi: 10.22323/1.390.0152

Podaci o odgovornosti

Kliček, Budimir

ESSnuSB

engleski

The ESSnuSB project

Considering the relatively large value of the last measured neutrino mixing angle $\theta_{; ; ; 13}; ; ; $, the way is now open to observe for the first time a possible CP violation in the leptonic sector. The measured value of $\theta_{; ; ; 13}; ; ; $ also privileges the \nth{; ; ; 2}; ; ; oscillation maximum for the discovery of CP violation instead of the usually used \nth{; ; ; 1}; ; ; oscillation maximum. The sensitivity to the CP violation signal at this \nth{; ; ; 2}; ; ; oscillation maximum is significantly higher than at the \nth{; ; ; 1}; ; ; oscillation maximum thereby making the measurement significantly less sensitive to the systematic errors. Going to the \nth{; ; ; 2}; ; ; oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. The world’s most intense pulsed spallation neutron source, the European Spallation Source, will have a proton linac with the unprecedented power of 5 MW and 2 GeV energy. This linac, currently under construction, also has the potential to become the proton driver of the world’s most intense neutrino beam with high potential to discover and well measure a neutrino CP violation. The physics performance of that neutrino Super Beam in conjunction with a megaton underground Water Cherenkov neutrino detector installed at a distance of about \SI{; ; ; 500}; ; ; {; ; ; km}; ; ; from ESS has been evaluated. In addition, the choice of such detector will extend the physics program to proton–decay, atmospheric neutrinos and astrophysics searches. The ESS proton linac upgrades, the accumulator ring needed for proton pulse compression, the target station optimization, and the physics potential are described. In addition to neutrinos, this facility will also produce at the same time a copious number of muons which could be used by a low energy nuSTORM facility, a Neutrino Factory or/and a muon collider. The ESS neutron facility will be ready by 2025 at which moment the upgrades for the neutrino facility could start.

neutrino ; CP violation

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

152

2021.

objavljeno

10.22323/1.390.0152

Podaci o matičnoj publikaciji

Proceedings of Science Volume 390 - 40th International Conference on High Energy physics (ICHEP2020) - Parallel: Neutrino Physics

Sissa Medialab

Podaci o skupu

Nepoznat skup

predavanje

29.02.1904-29.02.2096

Povezanost rada

Fizika

Poveznice