Impact of large human constructions on a karst river hydrology: Case of the Cetina river (Dinaric karst) (CROSBI ID 293241)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Bonacci, Ognjen ; Andrić, Ivo ; Roje-Bonacci, Tanja ; Oskoruš, Dijana ; Vrsalović, Adrijana Impact of large human constructions on a karst river hydrology: Case of the Cetina river (Dinaric karst) // Acta hydrotechnica, 33 (2020), 59; 155-174. doi: 10.15292/acta.hydro.2020.10

Podaci o odgovornosti

Bonacci, Ognjen ; Andrić, Ivo ; Roje-Bonacci, Tanja ; Oskoruš, Dijana ; Vrsalović, Adrijana

engleski

Impact of large human constructions on a karst river hydrology: Case of the Cetina river (Dinaric karst)

The paper studies drastic hydrological changes caused by construction of five reservoirs and six hydro-electric power plants (HEPP), built mostly in the 1960s, along the watercourse of the karst river Cetina, located in deep and well-developed Dinaric karst. The total river length from its spring to mouth in the Adriatic Sea is about 105 km. Discharges are monitored at nine gauging stations and then compared using statistical methods. Discharges measured before construction of hydraulic structures were compared with discharges measured afterwards. Analysis of the results determined that the complex natural hydrologic regime has been completely destroyed. The hydrology of the upper river, from the spring to the Prančevići Dam (length of about 65 km), is changed by the development and operation of the Peruča Reservoir and the Peruča HEPP, as well as the Lipa and the Buško Blato Reservoirs and Buško Blato and Orlovac HEPPs. Water diversion from the Prančevići Reservoir through two tunnels and pipelines to power the Zakučac HEPP has dangerously altered hydrological regime of the Cetina River’s 40 km- long downstream section. In the 65-km long upstream section, the hydrological regime was altered immediately after the Peruča Reservoir was put into operation. In the downstream section the majority of natural flow is lost. The mean annual discharges dropped from more than 100 m3 s-1 to less than 10 m3 s-1. Due to HEPPs operation, minimum annual discharges have drastically and dangerously decreased.

karst river hydrology ; hydro-electrical development ; the Cetina River ; river regime alteration ; Dinaric karst

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

33 (59)

2020.

155-174

objavljeno

0352-3551

1581-0267

10.15292/acta.hydro.2020.10

Povezanost rada

Građevinarstvo, Interdisciplinarne tehničke znanosti

Poveznice