Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System (CROSBI ID 289591)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Car-Pušić, Diana ; Petruševa, Silvana ; Žileska Pancovska, Valentina ; Zafirovski, Zlatko Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System // Advances in civil engineering, 2020 (2020), 1-13. doi: 10.1155/2020/8886170

Podaci o odgovornosti

Car-Pušić, Diana ; Petruševa, Silvana ; Žileska Pancovska, Valentina ; Zafirovski, Zlatko

engleski

Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System

A model for early construction cost prediction is useful for all construction project participants. This paper presents a combination of process based and data driven model for construction cost prediction in early project phases. Bromilow’s “time-cost” model is used as process based, and general regression neural network (GRNN), as data driven model. GRNN gave the most accurate prediction among three prediction models using neural networks which were applied, with the mean absolute percentage error (MAPE) of about 0.73% and the coefficient of determination R2 of 99.55%. The correlation coefficient between the predicted and the actual values is 0.998. The model is designed as an integral part of the Cost Predicting System (CPS), whose role is to estimate project costs in the early stages. The obtained results are used as Cost Model (CM) input being both part of the Decision Support System (DSS) and part of the wider Building Management Information System (BMIS). The model can be useful for all project participants to predict construction cost in early project stage, especially in the phases of bidding and contracting when many factors, which can determine the construction project implementation, are yet unknown.

construction costs, predicting, CPS, neural network, building management information system (BMIS)

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

2020

2020.

1-13

objavljeno

1687-8086

1687-8094

10.1155/2020/8886170

Trošak objave rada u otvorenom pristupu

Povezanost rada

Građevinarstvo