Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Work performance as part of a determined system of a construction project (CROSBI ID 696867)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Dvornik-Perhavec, Daniela ; Vidaković, Držislav Work performance as part of a determined system of a construction project // REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.) / Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel (ur.). Granada: University of Cantabria, 2020. str. 1292-1303

Podaci o odgovornosti

Dvornik-Perhavec, Daniela ; Vidaković, Držislav

engleski

Work performance as part of a determined system of a construction project

Every construction project is a system. It is determined with time, work quality and price. If one of these factor breaks, the investor suffers damage that affects the other system (for example sales, people who bought these buildings or flats, bank loans, and so on). Between the start (entry into the system) and the finish point (exit from the system) of the construction project are several solutions available. They are reflected in the economic, technical or time performance of the project. For the successful operation of the system, uncertainties must first be identified. Uncertainties arise from the non-systematic treatment of the project. It is necessary to eliminate them and ensure that the project is as determined as possible. Due to the structure of the project, we expect that the entire construction project is treated as a determined system (determined by the price, deadline, and quality of performed works). However, in the reconstruction of historical objects, we encounter other factors that influence the determination of the system and change it. It is influenced by the factors that the determined system changes into a stochastic system. The causes of the stochastic behavior of the system are when on a determined system involve external factors of a stochastic character or internal mechanisms, which are assumed as a stochastic and change in the system from unknown reasons. In this paper, we analyze the internal factors of work performance, which are important for construction quality, price, and deadline.

determined system, construction project, uncertainties, work performance

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

1292-1303.

2020.

objavljeno

Podaci o matičnoj publikaciji

REHABEND 2020 – 8th Euro-American Congress on Construction Pathology, Rehabilitation Technology and Heritage Management, (2.1. Theoretical criteria of the intervention project.)

Lombillo, Ignacio ; Blanco, Haydee ; Boffill, Yosbel

Granada: University of Cantabria

978-84-09-17871-1

Podaci o skupu

8th Euro-American Congress Construction Pathology, Rehabilitation Technology and Heritage Management

predavanje

28.09.2020-30.09.2020

Granada, Španjolska

Povezanost rada

Građevinarstvo