Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

The Optimization Process for Seaside Operations at Medium-Sized Container Terminals with a Multi-Quay Layout (CROSBI ID 285398)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Grubišić, Neven ; Krljan, Tomislav ; Maglić, Livia The Optimization Process for Seaside Operations at Medium-Sized Container Terminals with a Multi-Quay Layout // Journal of marine science and engineering, 8 (2020), 11; 891, 27. doi: 10.3390/jmse8110891

Podaci o odgovornosti

Grubišić, Neven ; Krljan, Tomislav ; Maglić, Livia

engleski

The Optimization Process for Seaside Operations at Medium-Sized Container Terminals with a Multi-Quay Layout

The optimization of seaside operations at container terminals includes solving standard berth and crane allocation problems. The question arises about the efficiency of such optimizations in small and medium-sized container terminals, with different quay designs or different terminal layouts. This paper focuses on developing an integrated model that would apply to medium-sized terminals with a multi-quay layout. The main objectives are determining the shortest possible vessel stay at the port and providing a high-reliability service to ship operators. The developed integrated model includes the optimization process in three stages: initiation, assignment, and adjustment. The model’s main feature is generating operational scenarios based on the cargo distribution onboard and integrated berth and crane allocation. The aim is to choose the most favorable option to optimize ships’ overall processing time in the planning horizon. The experiment was conducted to test the model’s functionality and justify the results by comparing the results obtained by the integrated model with the classical approach of berth and crane allocation in a multi-quay environment. The results show significant improvements in peak periods when ships’ arrivals are concentrated in smaller time intervals by applying the integrated model.

container terminal optimization ; berth and crane allocation problem ; port facility ; port productivity ; port equipment ; multi-quay layout ; medium-sized terminals

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

8 (11)

2020.

891

27

objavljeno

2077-1312

10.3390/jmse8110891

Povezanost rada

Tehnologija prometa i transport

Poveznice
Indeksiranost