THE PAG BRIDGE RENOVATION - A CASE STUDY
The Pag bridge was thoroughly reconstructed because of heavy damages caused by reinforcement corrosion. The design of new steel superstructure is presented. The repair of columns is briefly described. Effects of the superstructure replacement on the arch behaviour are discussed. The numerical analysis showed high sensitivity of the relatively elastic arch to the change of dead weight distribution.
arch bridge; reconstruction; concrete structure; structural damage
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
189-195-x.
2001.
objavljeno
Podaci o matičnoj publikaciji
Failures of concrete structures II
Javor, E.
Bratislava: Expertcentrum - Bratislava
Podaci o skupu
Failures of concrete structures
predavanje
05.09.2001-07.09.2001
Bratislava, Slovačka