Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

THE PAG BRIDGE RENOVATION - A CASE STUDY (CROSBI ID 488567)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Šavor, Zlatko ; Mujkanović, Nijaz ; Puž, Goran THE PAG BRIDGE RENOVATION - A CASE STUDY // Failures of concrete structures II / Javor, E. (ur.). Bratislava: Expertcentrum - Bratislava, 2001. str. 189-195-x

Podaci o odgovornosti

Šavor, Zlatko ; Mujkanović, Nijaz ; Puž, Goran

engleski

THE PAG BRIDGE RENOVATION - A CASE STUDY

The Pag bridge was thoroughly reconstructed because of heavy damages caused by reinforcement corrosion. The design of new steel superstructure is presented. The repair of columns is briefly described. Effects of the superstructure replacement on the arch behaviour are discussed. The numerical analysis showed high sensitivity of the relatively elastic arch to the change of dead weight distribution.

arch bridge; reconstruction; concrete structure; structural damage

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

189-195-x.

2001.

objavljeno

Podaci o matičnoj publikaciji

Failures of concrete structures II

Javor, E.

Bratislava: Expertcentrum - Bratislava

Podaci o skupu

Failures of concrete structures

predavanje

05.09.2001-07.09.2001

Bratislava, Slovačka

Povezanost rada

Brodogradnja, Strojarstvo