COST TU1406 - Technical report of the Working group 3: Establishment of a Quality Control Plan (CROSBI ID 18590)

Autorska knjiga | priručnik | međunarodna recenzija

Hajdin, R.Kušar, M ; Mašović, S ; Linneberg, P ; Amado, J ; Tanasić, N. ; Ademović, N ; Costa, C ; Kušter Marić, M ; Almeida, J ; Galvão, N et al. COST TU1406 - Technical report of the Working group 3: Establishment of a Quality Control Plan. Guimaraes, 2018. doi: 10.13140/RG.2.2.28730.03526

Podaci o odgovornosti

Hajdin, R.Kušar, M ; Mašović, S ; Linneberg, P ; Amado, J ; Tanasić, N. ; Ademović, N ; Costa, C ; Kušter Marić, M ; Almeida, J ; Galvão, N ; Sein, S ; Zanini, M ; Pendergast L

engleski

COST TU1406 - Technical report of the Working group 3: Establishment of a Quality Control Plan

The desired service quality of the whole bridge can be affected by a single dysfunctional component or by the combination of several dysfunctional components. The decrease in bridge service quality clearly depends on the degree of components’ dysfunctionality. This dependency can be modelled, among others, by Bayesian nets, which provide the time variation of each bridge component performance. However, in order to assure a desired service quality with minimum interruptions, bridge owners launch preventative actions when the risk of service impairment, interruption or losses in life cycle costs reaches some predefined level. Implicitly the owners define herewith the accepted risk which can be different from country to country, based on social equity principles. This accepted risk depends upon the established performance goals for each component or combination of bridge components. The QC plan mirrors these findings and is used for maintenance planning by defining a criteria for triggering maintenance interventions. Clearly, these QC plans have to be established for each individual bridge. They perform the basis for the asset management of this type of roadway infrastructure. The objective of this task is to establish a procedure, based on Bayesian nets or other heuristic rules used worldwide, which would allow the bridge owner to define a QC plan for each individual bridge.

Observation ; Performance indicator ; Key performance indicators ; Quality control plan ; Failure mode ; Vulnerable zones

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

Guimaraes:

2018.

978-86-7518-200-9

116

objavljeno

10.13140/RG.2.2.28730.03526

Povezanost rada

Građevinarstvo