Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time (CROSBI ID 271923)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Poljak, Igor ; Orović, Josip ; Knežević, Vlatko ; Mrzljak, Vedran LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time // TransNav, 14 (2020), 39-42. doi: 10.12716/1001.14.01.03

Podaci o odgovornosti

Poljak, Igor ; Orović, Josip ; Knežević, Vlatko ; Mrzljak, Vedran

engleski

LNG Carrier Main Steam Turbine Reliability in the Exploatation Period of Time

In this paper the LNG carrier with steam turbine propulsion plant maintenance records has been analysed. Actual observed data from the ship, built in 2001, are from ship maintenance history data from September 2002 until August 2010. During the analysed period, main propulsion turbine had one major failure and several minor failures. The ship had three dry docks and one was prolonged due to increased requirements for cargo transport. Total running hours of the main propulsion turbine in the observed period of time were 63204 hours. The list of failures and influence of each mentioned failure of main turbine propulsion machinery is discussed and analysed in respect to the propulsion autonomy of the vessel.

Engine Room Maintenance ; LNG Carrier ; Steam Turbine ; Exploatation, Exploatation Period of Time ; Main Steam Turbine ; Main Propulsion Turbine ; Reliability

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

14

2020.

39-42

objavljeno

2083-6473

2083-6481

10.12716/1001.14.01.03

Povezanost rada

Strojarstvo, Tehnologija prometa i transport

Poveznice
Indeksiranost