Investigation of the remaining life of an immersed tube tunnel in The Netherlands (CROSBI ID 684097)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Gavin, Kenneth ; Broere, Wout ; Kovačević, Meho Saša ; de Haas, K.
engleski
Investigation of the remaining life of an immersed tube tunnel in The Netherlands
In this paper we present issues related to the performance of immersed tube tunnels in the Netherlands. A range of issues are experienced for the ageing structures including long-term settlement at tunnel joints and consequent leakage. Because of the age of these structures some important aspects are often unknown thus creating uncertainty regarding remediation measures. Having discussed general issues the paper presents a case study of the Kil Tunnel which has experienced relatively large settlements over the past 40 years. In this case a lack of geotechnical engineering information for the soils below the tunnel was identified. A geophysical survey was undertaken and this provided ley insights into the ground conditions at the tunnel site.
immersed tunnel ; ageing structures ; long-term settlement ; MASW
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
4831-4838.
2019.
objavljeno
10.1201/9780429424441-512
Podaci o matičnoj publikaciji
Proceedings of the WTC 2019 ITA-AITES World Tunnel Congress
Peila, D. ; Viggiani, G. ; Celestino, T.
London : Delhi: CRC Press ; A.A. Balkema Publishers ; Taylor & Francis
Podaci o skupu
Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art
poster
03.05.2019-09.05.2019
Napulj, Italija