Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Probability risk assessment of island operation event for large scale photovoltaic plant (CROSBI ID 267783)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Ivas, Mihovil ; Marušić, Ante ; Havelka, Juraj George ; Capuder, Tomislav Probability risk assessment of island operation event for large scale photovoltaic plant // Automatika : časopis za automatiku, mjerenje, elektroniku, računarstvo i komunikacije, 60 (2019), 2; 181-192. doi: 10.1080/00051144.2019.1591071

Podaci o odgovornosti

Ivas, Mihovil ; Marušić, Ante ; Havelka, Juraj George ; Capuder, Tomislav

engleski

Probability risk assessment of island operation event for large scale photovoltaic plant

Original methodology for the calculation of island operation event occurrence possibility is proposed for the photovoltaic power plants connected to medium voltage grid. Within the methodology description, event fault tree with number of pairs of basic initial events is discussed, where probability for the basic events are defined and flow chart for the proposed calculation is given. The novelty in the approach for probability calculation includes also proposal for development of frequency distribution functions for concerned power generation and consumption variables which have to be modelled for the probability calculations, for which the triangular distributions curves have been chosen. Being boundary conditions for definition of non-detected island event, borders of non-detection zones are defined for the common island detection protection functions: over frequency and under frequency, over voltage and under voltage and rate of change of frequency functions. Comparison of the island event probability is presented on case study example, with conclusion that standard voltage and frequency protection alone are not satisfying, but ROCOF protection could be suitable, subject to particular local grid characteristic and calculative verification of probability.

photovoltaic plant ; island operation ; probability risk assessment ; medium voltage ; loss of mains protection

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

60 (2)

2019.

181-192

objavljeno

0005-1144

1848-3380

10.1080/00051144.2019.1591071

Povezanost rada

Elektrotehnika

Poveznice
Indeksiranost